Parent company logo
Group 13
Contact us todayGroup
September 17, 2026

Ultra Pro X Certification Gates Short Surveys

Treat certification as a binary route gate. If no classified workfront requires the named certification, co

September 17, 2026

Sand Monitoring Data Guides The Well Start-Up

Read a well start-up as a series of response shapes, not a sequence of isolated peaks. For each authorised

September 17, 2026

Alignment Rental Planning For Short Shutdowns

Choose one of three rental jobs: a shaft-alignment package, a bore-measurement package, or an accessory top

September 14, 2026

What To Confirm For Long Distance Inspections

Build a blind-spot portfolio before preparing any route enquiry. Assign each unknown to inline screening, f

August 27, 2026

How Inline Inspection Limits Pipe Blind Spots

Build a blind-spot portfolio before preparing any route enquiry. Assign each unknown to inline screening, f

August 26, 2026

How Topside Corrosion Supports Remote Plans

Use the installed-path trend to choose among three logistical outcomes: continue remote trending, bring the

August 24, 2026

What Subsea PIG Detectors Confirm in a Run

A subsea PIG detector confirms one event: a PIG passed a known installation point. Its value in subsea PIG

August 20, 2026

Hazardous Gas Checks for Maintenance Windows

Work backwards from handback. Reserve time for reviewing captured indications, place observation after the

August 19, 2026

Hydrogen Leak Detection in Ventilated Areas

Plan the observation as an interference experiment. Hold the nominated component and camera position steady

Need expert advice?

Fill out the form below and our technical team will be in touch
Get in touch